Lot 1 - Construction Of The Eastern Transmission (Kiambu – Embakasi) PipelineScope of Works· Construction of Resident Engineer’s Office· 24.0 km of Pipeline consisting of 18.4km of DN 1000 Pipes and 5.6km of DN 900 pipes· 14,000m3 Reinforced Concrete Water Storage Tank at EmbakasiLot 2 - Construction Of The Western Transmission (Kabete – Uthiru – Karen) PipelineScope of Works· Water Transmission Pipeline, size DN 900 / DN 500 mm, length 14.25 km· Reinforced Concrete Water Storage Tank, capacity 5,000m3· Upgrading of Kabete – Uthiru Pumping System from 30,000m3/day to 72,000m3/day capacity· Additional Works: – Reinforced Concrete Water Storage Tank (capacity 500m3), Pumping Facility, Elevated R.C Tank (capacity 80m3) and associated works at Kenya High School (Instructed by AWWDA on 7th December 2018)Lot 3A - Extension Of Water And Sewerage Services In Peri-Urban and Informal SettlementsScope of Works· 23.0 km of Water Pipelines, HDPE sizes OD 32mm – OD 355mm· 25.5 km of Sewers, uPVC Sizes OD 200 mm – OD 315 mm· 2Nr Ablution Blocks in Gitari Marigo· 928 Consumer Sewer Connections in Ngando, Korogocho, Kawangware, Kangemi